
Multi-domain command platform
IRVMS-5000 Integrated Security Platform
- Platform role
- Base integrated security management
- Sensor domains
- Land, water and low altitude
- Interfaces
- SDK and project-specific third-party integration



Integrated ground, air, water and access control for protected sites.
IRVMS-6000 builds on the base IRVMS architecture for airports, bases, warehouses and other critical sites. It coordinates perimeter, low-altitude, access and patrol systems through a common operational picture.
System capabilities
Application fit
Technical data
Core performance and interface data for preliminary system selection.
Confirm a project configuration →| Platform role | Critical-site command and control |
|---|---|
| Domains | Perimeter, access, low altitude and patrol |
| Integration | OMNI UXV and supported third-party subsystems |
| Architecture | Project-engineered on-premises deployment |
Engineering path
A clear sequence keeps product selection, integration and acceptance tied to the mission.
Confirm the environment, users, required outcome and constraints.
Resolve payload, interfaces, accessories and performance targets.
Agree tests, documentation, training, delivery and handover criteria.
Selection context
Use these guides to test the mission assumptions behind a product shortlist.
Engineering Guide
Plan a port security system across air, landside, waterside, and underwater zones with integrated confirmation, cybersecurity, grant evidence, and acceptance tests.
Buyer's Guide
Evaluate physical security software by event models, connectors, operator workflows, degraded operation, cybersecurity, lifecycle cost, and capability tests.
Integration can be reviewed around the mission, selected options and interfaces. Typical engineering inputs include multi-domain operational picture, alarm and device correlation, identity and access integration, destination-country requirements and the intended operating environment.
Provide the destination country, operating scenario, required quantity, target performance, payload or integration requirements, delivery timing and any mandatory standards.
Continue comparing

Multi-domain command platform

Port and waterfront command
Send the mission profile and destination country. We will confirm the suitable configuration, documentation scope, lead time and acceptance plan.
Request a technical review