
Seabed imaging
SNR900U Side-Scan Sonar
- Frequency options
- 400/900 kHz or 600/1600 kHz
- Reference range
- 150 m at 400 kHz; 75 m at 900 kHz
- Pulse type
- CHIRP



A 70 kg ROV for observation, rescue support and light intervention.
The G70 combines eight-thruster maneuvering with modular payload interfaces. It supports underwater search, hydroelectric inspection and light intervention with optional sonar, positioning and manipulator payloads.
System capabilities
Application fit
Technical data
Core performance and interface data for preliminary system selection.
Confirm a project configuration →| Weight in air | 70 kg |
|---|---|
| Operating depth | 0–300 m |
| Current resistance | 3 kn reference |
| Thrusters | 8 × 12 kgf |
| Cameras | 3 × 1080p |
Engineering path
A clear sequence keeps product selection, integration and acceptance tied to the mission.
Confirm the environment, users, required outcome and constraints.
Resolve payload, interfaces, accessories and performance targets.
Agree tests, documentation, training, delivery and handover criteria.
Selection context
Use these guides to test the mission assumptions behind a product shortlist.
Market & Regulation
Assess resident subsea robotics using docking, power, data transfer, intervention and recovery costs, with research and industry examples.
Engineering Guide
Plan ROV ultrasonic thickness measurements around probe contact, sound velocity, location and validity rather than a thickness number alone.
Integration can be reviewed around the mission, selected options and interfaces. Typical engineering inputs include eight-thruster maneuvering, automatic depth and heading, modular payload interfaces, destination-country requirements and the intended operating environment.
Provide the destination country, operating scenario, required quantity, target performance, payload or integration requirements, delivery timing and any mandatory standards.
Continue comparing

Seabed imaging

High-resolution bathymetry

Underwater perception
Send the mission profile and destination country. We will confirm the suitable configuration, documentation scope, lead time and acceptance plan.
Request a technical review